The main sections of the modular house are arriving from the Simplex factory by flatbed truck. With the foundation already in place, the building lot quickly transforms into a home site.

Before being hoisted into position, each box is unwrapped and additional prep work is done. Once the final preparations are complete, the crane operator deftly arranges each box into position.

Dave Boniello和Pat Fricchione从Simplex加入Bob位置,因为它在一起时巡回旅游,提供额外的洞察组装模块化家园的过程。

General Contractor Michael Shiels is also on site to give us a progress report on the assembly process, as well as a briefing on the next steps.
第1部分:模块化家庭送货
Part 2: Tying Together a Modular Home
Part 3: Installation of the Modular Home's Second Floor
Part 4: Preparing the Site for Modular Home Delivery
Bob reviews the site preparation process with Michael Shiels (of Shiels Builders), who is the local on-site contractor for the project. Shiels ensures all hook-ups, from plumbing to electrical, meet local code and are ready to go.

Shiels还安排建筑检查,并确保为房屋提供和安装而准备了场地和基础。
Part 5: Modular Home Delivery Day Overview
在新英格兰的一些最美丽的乡村的令人叹为观止的令人叹为观止的景色,这艺术和工艺品风格平房肯定没有看起来肯定没有。你永远不会知道它是一个模块化的家,除非鲍勃带你去宾夕法尼亚州的建造,几乎从开始完成。

The house goes down the assembly line from framing, through wiring and plumbing, all the way to the installation of flooring and priming for paint.

The house is trucked to its pre-fabricated foundations on the lot, and start all the finishing touches that will prove that a modular house doesn't have to be a cookie-cutter affair.