巡回完成的地下室改造

项目:地下室装修和家庭空间,第12集,部分3.



Bob在梅尔罗斯,这里的景观照明设备安装在前院和后院,使用12/2电线连续连接,从最后一个灯具一直到中心,连接实心黄铜灯具和整个场地的20瓦灯泡。院子只有一条线路,但可以设置成区域,在天黑时打开灯,或者打破前院、后院和侧院之间的控制。外部完全重新布线,用于照明和插座,而内部则采用射频控制照明,为家庭的不同区域提供场景。孩子们的房间重新布置了一张双人桌、玩具仓库、抽屉和书架。地下室的排水系统、防水系统、新地板、简易地毯、媒体室躺椅、音频和视频系统、成品存储、带浸渍厕所和泵的第二个浴室、洗衣房和小办公桌。整个地下室由一个地下室系统完成,该系统为抛光、隔音的新家庭房间提供了墙壁、装饰、门和天花板。新的火炉、中央空气、空气净化和按需热水系统都隐藏在完成的墙壁后面,它们安静地运行,保持整个房子的舒适。

第1部分:安装外部照明
第2部分:规划外部和室内照明,存储解决方案和室内装饰
第三部分:参观完成的地下室改造
新的家庭间都是完成的,带装饰,看起来很棒。Bob与Sarah Monzon会谈,房主也被担任该项目的一般承包商,关于房间里完成的重塑工作。在项目开始之前,房间是蒙扎的“洞穴”。以前用作洗衣的挖坑石水槽,并已成为一只眼睛。房间也被累计垃圾弄乱了。由于房子里的空间短缺,家庭决定完成地下室加入家庭的生活空间。Monzon担任该项目的一般承包商,因为没有金钱预算为费用,这不一定是她选择重复的经验。本地检验服务部门为新手将军提供了大量信息。在房主之前,在他们的家庭工作之前,他们必须获得必要的许可证,并找出什么是安全的,而不是。如果房主在没有许可证的情况下在他们的家中工作,并且出现任何问题,保险将不会涵盖损坏。 Before any work was done on the house, the basement floors were concrete and heating ducts crisscrossed the ceiling. There was flooding damage in the basement during the past fall which needed to be corrected and prevented in the future. Basement Systems was called in to install a perimeter drain and drainage system. A lot of existing plumbing was then moved from the ceiling to make more headspace and a new HVAC system was installed to move the heating ducts. The new central air system complete with an air filter made the house much more livable. In one of the smaller spaces in the basement, a new bathroom was installed with the help of technology from Saniflo. Owens Corning Basement Finishing Systems was then called in to install new finished walls. Many of the mechanical devices in the basement are now hidden behind the walls but are still accessible as the walls can be easily removed. A new entertainment center was then installed in the finished basement featuring a S1 Digital Media Center. The media center allows the homeowner to browse digital pictures taken using the family's digital camera or to set the image as wallpaper for the screen. Television shows can be watched or recorded using a schedule guide. The media center also can store home videos, movies, and music. New reclining chairs from Bell'O were put in the entertainment room. When laying protection from flood damage in a basement, it is important to elevate wood from the concrete floor. Instead of using a plywood underlayment, a plastic tile system was used which interlocks and can be screwed down onto the concrete. Plastic webbing underneath the tiles diverts any water which may come up through the concrete or spill in the basement to the perimeter drain. Slide-Lok cabinets were put in the basement to increase storage space. The Slide-Lok wall system was put in place to hang tools in the workspace. The husband of the family is a musician and uses much of the storage space to hold his instruments. Because the room can double as rehearsal space, two and a half inches of fiberglass are in the walls to reduce sound transmission to the outside. The basement has a small office space for the husband as well. Accents throughout the space correlate with other things in the room. The lampshades on the desk have a design which relates to the flooring product. The floor does not have a wall-to-wall carpet although it looks as if it does. The floor is from Binvetec and features tiles of carpet which stick to the floor. The product has interlocking patterns which can easily be layed down. Bean bags from Sumo were put in the room for lounging in and the kids love to play on them. A stairwell fishtank from AquaVista is only four inches deep.

最受欢迎的视频

室外项目

众议院和花园旅游