Bob must deal with an overloaded septic system by replacing the old clogged tank and leach field. Since the bathroom has already been gutted, plumbers begin to install new fixtures. Contractor Bob Ryley demonstrates how to install a 48-pane window in the front addition. Bob also consults with a landscape architect, who shares ideas about dressing up the yard.
- 第1部分:取代化粪池系统
- Part 2: Installing New Bathroom Fixtures
- Since the bathroom has been gutted, plumbers begin to install new fixtures.
- 第3部分:审查景观
Bob Vila is in Plymouth, MA, to oversee the remodel of a worn-out, 17-year-old raised ranch with problems familiar to many homeowners. The façade is re-sided and repainted, windows are replaced, and a new entry is built. Inside, the new bath and kitchen, which are added, provide the project highlights.
ALL EPISODES IN SPLIT-LEVEL RANCH