参观完成的地下室改造

项目:地下室整理和家庭空间,第12集,第3.



鲍勃在玫瑰花,其中景观照明被安装在使用12/2线在连续引线从最后灯具一路到轮毂的正面和背面码在整个理由连接固体干黄铜夹具和20瓦灯泡。院子里是一个单一的电路,但可以作为有线区开启时,它的黑暗,还是分手控制前,后和侧面码之间的灯。它的外观是完全用于照明和插座重新接线,而内得到射频控制照明完整的场景为家庭的不同区域。孩子们的房间被重组以双台,玩具存储,抽屉和书架。地下室是完全有地下室排水完毕,防水,新的底层地板,容易粘方块地毯,媒体室躺椅,音频和视频系统,成品储存,第二浴用浸渍厕所和泵,洗衣房,和一个小的办公区。整个地下室完成了一个地下室系统,提供墙面,装饰,门和天花板的抛光,隔音新家庭房。新炉,中央空调,空气净化,和按需热水系统都藏成品墙壁,他们悄悄地功能,使整个房子舒适后面。

第1部分:安装外部照明
第二部分:规划室内外照明、存储解决方案和室内装饰
第3部分:房已完成地下室重塑
新的家庭房间全部完成,装饰和外观不俗的表现。鲍勃·萨拉蒙松,谁也作为该项目的总承包商,大约在房间做了改造工作房主谈判。房间是一个“洞穴”,根据蒙松在项目开始前。有凹痕皂石水槽以前用作洗涤,并已成为碍眼。房间里堆满还具有累积的垃圾。因为在家里空间短缺,家人决定完成地下室添加到家庭的生活空间。蒙松担任该项目的总承包商,因为没有预算的费用,这是没有必要的经验,她会选择重复钱。当地inspectional服务部门提供了大量的信息,对于新手总承包商。当务之急是房主做他们的家,他们获得必要的许可证,并找出哪些是安全的,哪些是没有任何工作之前。业主如果做自己的家园的工作没有许可证和任何差错,保险不涵盖的损害。 Before any work was done on the house, the basement floors were concrete and heating ducts crisscrossed the ceiling. There was flooding damage in the basement during the past fall which needed to be corrected and prevented in the future. Basement Systems was called in to install a perimeter drain and drainage system. A lot of existing plumbing was then moved from the ceiling to make more headspace and a new HVAC system was installed to move the heating ducts. The new central air system complete with an air filter made the house much more livable. In one of the smaller spaces in the basement, a new bathroom was installed with the help of technology from Saniflo. Owens Corning Basement Finishing Systems was then called in to install new finished walls. Many of the mechanical devices in the basement are now hidden behind the walls but are still accessible as the walls can be easily removed. A new entertainment center was then installed in the finished basement featuring a S1 Digital Media Center. The media center allows the homeowner to browse digital pictures taken using the family's digital camera or to set the image as wallpaper for the screen. Television shows can be watched or recorded using a schedule guide. The media center also can store home videos, movies, and music. New reclining chairs from Bell'O were put in the entertainment room. When laying protection from flood damage in a basement, it is important to elevate wood from the concrete floor. Instead of using a plywood underlayment, a plastic tile system was used which interlocks and can be screwed down onto the concrete. Plastic webbing underneath the tiles diverts any water which may come up through the concrete or spill in the basement to the perimeter drain. Slide-Lok cabinets were put in the basement to increase storage space. The Slide-Lok wall system was put in place to hang tools in the workspace. The husband of the family is a musician and uses much of the storage space to hold his instruments. Because the room can double as rehearsal space, two and a half inches of fiberglass are in the walls to reduce sound transmission to the outside. The basement has a small office space for the husband as well. Accents throughout the space correlate with other things in the room. The lampshades on the desk have a design which relates to the flooring product. The floor does not have a wall-to-wall carpet although it looks as if it does. The floor is from Binvetec and features tiles of carpet which stick to the floor. The product has interlocking patterns which can easily be layed down. Bean bags from Sumo were put in the room for lounging in and the kids love to play on them. A stairwell fishtank from AquaVista is only four inches deep.

最受欢迎CLIPS

户外项目

家居及花园之旅